| HOME |
| KITCHEN/GREAT ROOM |
| MASTER BEDROOM & BATH |
| AWAY ROOM | | SECOND STORY | | CLEARSTORY & LIVING ROOM |

- Page 6 -

Alright, here it is close to finish -- the cosmic shower. I think it's coming together very well. Check the rain shower head in the ceiling. Yet to be installed is the hand held shower head that goes on the right side, the trim on the temperature control (black object) on the left and the steam head and control. The steam generator is installed under the sink area of the vanity.

Carpeting is now finished in the master bedroom. It's a very nice shade of mauve and ties well with the bathroom painting. The area in front of the french doors is the same tile as the bathroom. Mud will not make it to the carpet hopefully.

Updating the cosmic shower -- almost totally complere. They are finishing installation of the steam generator controller and we are waiting for the glass door for the front.
The master bedroom with the furniture finally in it. Still have some stuff to hang on the wall.
 

previous page
 

 

| HOME |
| KITCHEN/GREAT ROOM |
| MASTER BEDROOM & BATH |
| AWAY ROOM | | SECOND STORY | | CLEARSTORY & LIVING ROOM |